Portfolio
-
- Reporting to Owner
- Demolition of 16-story commercial office building
- Construction of 18-story Hyatt hotel complete with below grade Ottawa Hydro substation for future development and hydro infrastructure upgrade.
- Project Cost $90m.
-
- Reporting to General Manager
- Reconstructed existing combined sanitary and storm overflow chamber to accommodate to approach to bridge.
- Built new below grade access to chamber with off set building above grade.
- 10million
-
- Responsible to General Manager
- Completed final phase as well as outstanding building code issues for city sign-off.
- Demolished both old ikea store and sears store
- Rebuilt old ikea store to the new 100 000sqft sears furniture store.
Project Cost: $25m
-
- responsible to general manager
- construction of $5.6 million structural steel, precast, concrete reinforced state of the art seven theater facility
- managed subsoil bearing capacity and water table
- managed hard and soft landscaping
- managed all site work infrastructure with regards to water, sanitary, storm, gas, hydro, and communications
-
- responsible to project manager
- managed the reinforced concrete, structural steel, and precast of this $40 million radioactive isotopes production facility.
- managed rock removal, piling, and rock anchors.
- managed methods, products, and applications according to nuclear licensing building standards.
- managed installation of 25 ton overhead gantry crane
- managed batching, delivery, and placing of 7 500 lbs per m3 shielding concrete
- managed mill-rite hot cell installation and nuclear water containment pools, and transfer water canals
-
- responsible to project executive
- construction of $140 million concrete reinforced twin luxury condominium towers
- managed $2.3 million site de-watering program
- managed construction of two rooftop heli-landing pads
- procured and managed all materials, equipment, and services supplied by Ledcor
-
- responsible to vice president of construction
- demolition of 6-level reinforced concrete building, 30 000 sq ft per level
- planned, trained, and managed all aspects and trades required for demolition
-
- responsible to project manager
- managed construction of 2000 lin/ft feet of 4'6" high concrete reinforced, stone-faced, and stone-capped architectural fencing
- managed 3.2 million of site work consisting of road ways both sub-base and asphalt, curbs, sidewalks, and storm drainage system
- managed construction of perimeter street lighting
- managed extensive hard and soft landscaping
-
- responsible to senior project manager
- prepared site for the construction of a new $65 million, concrete reinforced, structural steel, and masonry 300 bed correctional facility
- managed a $11 million cash allowance security component that was separate from the primary contract
- managed tendering documentation, pre-tendering site tours and meetings,and closing of tenders with client
-
- responsible to vice-president of construction
- managed concrete reinforcement, masonry, exposed aggregate precast, and one design window system by Gamma Industries for the construction of a $90 million 4 ½ star hotel
- managed blasting and removal of 3000 m3 of armor stone and drilling for 240 sets of rock anchors.
- managed installation of five geared passenger elevators, three hydraulic passenger elevators, one geared guillotine, and two 2-story escalators
- managed three indoor and two outdoor pool installations
- managed construction of a $5 million in-house Spanish-themed kitchen and restaurant
-
- responsible to project manager
- managed reinforce concrete, masonry, EFIS and structural steel building envelope, and structural steel mechanical penthouse for this $34 million hotel.
- managed the building of two floors of activity space, including a swimming pool, activity rooms, restaurant, main ball room, and board rooms and nine floors of hotel rooms.
-
- responsible to project manager
- managed the $50 million electrical, mechanical, suppression, and communication systems modernization
- managed project architectural features including new retail store fronts
- managed approximately 250 000 sq ft of re-roofing
- managed new two story main entrance structural steel and curtain wall, escalators, geared elevator, and connection to elevated pedestrian transit link
-
- responsible to general manager
- managed reinforced concrete, masonry, and structural steel for this $37 million three building complex
- managed building of three levels of below grade parking which was achieved by drilling, blasting, piling, shoring, and rock anchors.
- managed the building of three floors of 24-hour healthcare infrastructure
- managed installation of three geared elevators and two hydraulic elevators
-
- responsible to general manager
- managed reinforced concrete, Arriscraft limestone, hard and soft landscaping, and dedication engraving for this $4 million historical monument.
- managed installation of water, storm, irrigation, and electrical services
- managed installation of statues and architectural features
-
- responsible to vice president
- managed concrete reinforced, masonry, and structural steel for this $100 million nuclear facility
- procured and managed portable site concrete batch plant for both conventional concrete and shielding concrete
- managed construction of two 20ft deep water containment pools with mid-point transfer canal
- managed mechanical, electrical, and mill work construction
- oversaw QA and QC program to meet nuclear licensing standards
- managed installation of two 25 ton overhead gantry cranes